LTSV > Service Vehicles > More > Timeline Event List > Timeline Event Details (ID 44)
Timeline Event Details

Date: c. 15/09/1975
Category: London Buses
Title: Plan to use hired coaches on peak bus services was rejected
Details: Faced with a shortage of both staff and serviceable buses, LT planned to use hired coaches at peak times on 32 routes, but this was abandoned due to union opposition. Revised schedules were introduced instead, though some hired coaches were used on routes 125 and 270 until April 1976.
Source: LOTS TLB134 (October 1975)
Added: 19/09/2022 by Thomas Young
Notes

No notes have been posted about this Timeline Event.
Data History

Edits ?This section shows any changes that have been made to the database record for this operator. Unless you are logged-in as an Editor or Admin, only Edits marked as Public will be shown (i.e. not Private Edits).
This Timeline Event has not yet been edited.