Numbers | Class | Design | Type | Qty | Origin | Built/Converted | Date/s | Lot |
15425-15435 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 11 | New | BR, Derby | 1953 | 30076 |
15436-15442 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 7 | New | BR, Derby | 1954 | 30081 |
15533-15542 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 10 | New | Metro-Cammell | 1954 | 30063 |
15563-15584 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 22 | New | Metro-Cammell | 1955 | 30135 |
15597-15624 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 28 | New | Birmingham RC&W | 1955 | 30139 |
15771-15820 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 50 | New | Metro-Cammell | 1955-1956 | 30180 |
15861-15915 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 55 | New | Metro-Cammell | 1956 | 30222 |
16198-16225 | AA31 | 128 | Mk.1 Corridor Composite (CK) | 28 | New | BR, Derby | 1961 | 30666 |
What | How much | Source |
Bogie centres | 46ft 6in | BR diagram book on BMRG website |
Length over headstocks | 63ft 5in | BR diagram book on BMRG website |
Length over buffers (extended) | 67ft 1in | BR diagram book on BMRG website |
Bogie wheelbase | 8ft 6in | BR diagram book on BMRG website |
Height overall | 12ft 9.5in | BR diagram book on BMRG website |
Width overall | 9ft 3in | BR diagram book on BMRG website |
Seats | 48 | BR diagram book on BMRG website |
Views ? Which views does the drawing include? S = side elevation E = end elevation P = plan view D = detail (scrap views, sections etc) |
Quality ? How much detail is in the drawing? High - all/most detail included Medium - some detail omitted Low - basic diagram |
Comment | Origins | Source |
SEP | High | BR diagram book | Page 53 of Coaching_Stock_N1_web.pdf on Barrowmore MRG website http://www.barrowmoremrg.co.uk/Prototype.html | |
SEP | High | BR diagram book | Page 54 of Coaching_Stock_N2_web.pdf on Barrowmore MRG website http://www.barrowmoremrg.co.uk/Prototype.html | |
SEP | High | BR diagram book | Page 74 of Coaching_Stock_N3_web.pdf on Barrowmore MRG website http://www.barrowmoremrg.co.uk/Prototype.html | |
SEP | Medium | BR diagram book | Page 75 of Coaching_Stock_N3_web.pdf on Barrowmore MRG website http://www.barrowmoremrg.co.uk/Prototype.html |
Item added: | 12:00 on 01/01/2020 by Thomas Young |
Approval status: | Approved, auto/admin |
Item approved: | 01/01/2020 by Thomas Young |
Time / Date | Edited by | Change |
14:35 on Sun 05/09/2021 | Thomas Young | Key photo added |