Loading timer

LTSV > Rail Data > Data > Codes > Designs > BR TOPS Wagon Design Code PC008A
Main details
Design/Diagram series: BR TOPS Wagon Design Code Previous Next
Design/Diagram ID: PC008A In selection ?This works on your last-used designs selection, including any filters and sort orders. Buttons will not show if the current design was not in your last selection, or if you are at the beginning or end of the data set.
Description: 51t GLW Presflo - Powder Overall ?This works on the overall designs list without any filtering or sorting applied.
TOPS code: PCA-B
On Date:
Status: TBC
Off Date:
Key Photo:
Icon: icon
Source of information: Diagram book on Barrowmore Model Railway Group website
Batches
There is one batch recorded as being wholly to this design code/diagram.
Numbers Class Design Type Qty Origin Built/Converted Date/s Lot
TC8983-TC9018 PCA-B PC008A 39.2t 'Presflo' Cement Wagon 36 New IMC Engineering, Hartlepool 1972-1973
Profiles ?Profiles provide an overview of the histories of various types of train. Profiles that are relevant to this design/diagram are listed below.
Photos - Internal
There are no photos of this design on this website.

Photos - External
No external photos of this item yet.
Listings
There are 108 listings (with 36 distinct numbers) to this design. The most recent 50 are shown below.
Date ?The date of the listing. Newest listings are shown first. Type ?Listings are either plain listings (reported details at a given date) or changes (changes of details on a given date). Hover over a code for the explanation. Status ?The status of this number at (or after) the given date. Hover over a code for the explanation. Prefix ?The prefix carried at the given date. Hover over a prefix for an explanation. Number TOPS Design Pool Livery Allocation Location Notes ?Shows the approval status of each listing. Hover over an icon for an explanation.
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8983 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8984 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8985 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8986 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8987 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8988 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8989 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8990 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8991 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8992 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8993 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8994 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8995 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8996 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8997 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8998 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8999 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9000 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9001 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9002 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9003 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9004 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9005 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9006 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9007 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9008 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9009 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9010 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9011 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9012 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9013 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9014 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9015 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9016 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9017 PCA PC008A Approved, auto/admin
01/01/1992 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
9018 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8983 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8984 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8985 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8986 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8987 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8988 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8989 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8990 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8991 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8992 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8993 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8994 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8995 PCA PC008A Approved, auto/admin
01/04/1990 LListing (e.g. in an ABC) AExtant, Registered, Active TCTunnel Cement Ltd
Click here for more details of this prefix
8996 PCA PC008A Approved, auto/admin
Notes
No notes have been left yet. ?There may be some notes posted but which have not yet been approved.
Related information
Dimensions ?Dimensions are normally recorded against design/diagram numbers. They can be recorded against batches, lots or TOPS codes if the design/diagram is not available.
There are no dimensions recorded for this design.
Drawings
There are 2 drawings referenced for this design.
Views ? Which views does the drawing include?
S = side elevation
E = end elevation
P = plan view
D = detail (scrap views, sections etc)
Quality ? How much detail is in the drawing?
High - all/most detail included
Medium - some detail omitted
Low - basic diagram
Comment Origins Source
SE Low Issue 2 BR diagram book Page 42 of Book300Part1Issue.pdf on Barrowmore MRG website http://www.barrowmoremrg.co.uk/Prototype.html
SE Low BR diagram book Page 62 of BRPOWagons1Issue.pdf on Barrowmore MRG website http://www.barrowmoremrg.co.uk/Prototype.html
Data History
Item added: 12:00 on 01/01/2020 by Thomas Young
Approval status: ball graphic Approved, auto/admin
Item approved: 01/01/2020 by Thomas Young

This item has not been edited.